PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued prepping and installing wire mesh for the slab on grade Facing South (800x600).jpg Installing rebar for the slab on grade Facing North-East (800x600).jpg Poured the concrete slab on deck (2nd Floor) Facing East (800x600).jpg Installed shear studs at the 4th Floor Facing East (800x600) (2).jpg Installed shear studs at the 4th Floor Facing East (800x600).jpg
Next page Continued prepping and installing wire mesh for the slab on grade Facing South (800x600)
Continued prepping and installing wire mesh for the slab on grade Facing South (800x600)